Instructions

Step 1. Before operation, please carefully check whether there is leakage in each pipeline system, whether each pipeline interface is loose, and whether the electrical components are normal.

Step 2. Power on the device and turn it on.

Step 3. Put in the material.

Step 4. Switch to automatic mode.

Step 5. Turn on the oil pump.

Step 6. After the automatic stop of feeding, press the automatic pressing button.

Step 7. Press the push button to push the bale out.

Step 8. The automatic compression and packaging operation is completed.